MOORE, J.
Questar Exploration & Production Co. appeals a judgment that partially (as to "deep rights," below the Hosston formation) dissolved a mineral lease on a finding that Questar failed to explore or develop the leased property with respect to Haynesville Shale and awarded the lessors attorney fees of $71,773.20. The lessors, Santo and Annie Ferrara, have answered the appeal, seeking additional attorney fees. The Louisiana Oil & Gas Association ("LOGA") has filed an amicus curiae brief, aligning itself with Questar and seeking reversal. For the reasons expressed, we reverse and render.
The Ferraras own a 48-acre tract in DeSoto Parish. In November 1988, they granted an oil, gas and mineral lease to Long Oil Co. with a three-year term and the standard habendum clause.
In 1994, the Ferraras made a demand on Tide West for further exploration and/or development pursuant to the lease. As a result, Tide West granted a partial release of the lease, as to the Baker Lime formation, in 1995. Questar acquired Tide West's rights by various assignments in 1999. In 2000, Questar drilled a well (Lillie Smith Alt. # 1) not on the leased premises but on land unitized with it. This well went into the Hosston formation and has been in continuous production ever since.
In short, there is currently no active well on the leased premises and no drilling has occurred since 1990, although the Ferraras have received royalties of roughly $88,000 from three wells on unitized lands since 1989. According to Questar, the Ferraras made no further demands for exploration or development until 2008.
One week later, on August 25, 2008, the Ferraras sent a certified letter to Questar demanding that it release the lease below the Hosston formation or, alternatively, explore and develop the deeper zones, including the Cotton Valley and Haynesville Shale formations. Mr. Ferrara testified that the object of the letter was to "get the lease back" but he received no response of any kind from Questar. Questar concedes that it did not promptly act on the letter.
Forty-six days later, on October 10, 2008, the Ferraras filed this suit demanding dissolution of the lease, damages and attorney fees; in the alternative, they demanded a partial release below the Hosston formation. Questar denied all claims.
In discovery, the Ferraras stated they would call as an expert Homer H. Peel, an "independent landman specializing in database research and tracking spreadsheets." Peel's October 2009 report summarized data from the Department of Conservation's Website, SONRIS, specifically how many wells were drilled in the Haynesville Shale and how many were drilled by Questar. Questar filed a motion to exclude Peel's testimony under La. C.E. art. 702 as he performed no independent research and drew no conclusions. Questar also filed a motion for summary judgment, urging that the Ferraras could not prove an unreasonable failure to explore. Questar attached a list of undisputed facts and a copy of Peel's report, but offered no evidence of its own. The district court denied both of Questar's motions.
The matter proceeded to trial over two days in May 2010. Only three witnesses testified. The elderly Mr. Ferrara and his son, Mark Ferrara, who assisted him in business matters, described the facts outlined above. They also testified that about six days before trial, they received a letter from Questar offering to develop a unit including the leased premises; Questar argued that this letter was actually from a separate entity, J-W Operating Co., with no connection to Questar, providing notice of intent to create a unit in the Haynesville Shale. The third witness was Peel, whom the court accepted as an expert in "compilation of public information on Haynesville Shale, obtained through the official Website of the Department of Conservation." He testified that through the end of 2008, 150 wells had been permitted, drilled or completed in the nine-township area around the leased premises, and Questar had drilled 70 wells in the Haynesville Shale on property other than the Ferraras'. Questar raised frequent and strident objections to Peel's expertise and contended
With this evidence, the Ferraras rested their case. Questar moved for involuntary dismissal as to the claims for damages, attorney fees and the principal claim for breach of the implied duty to explore and develop. The court granted the motion with respect to damages only (a ruling not contested on appeal) but otherwise denied.
Questar then rested without presenting any evidence. The matter was submitted on post-trial briefs.
The court issued an 11-page written ruling, noting the "unique characteristics of the Haynesville Shale" and the fact that Questar provided no evidence in its case-in-chief. The court rejected the suspension doctrine as an equitable remedy that predated the Mineral Code, and expressly relied on evidence of exploration activities that occurred after the Ferraras filed this suit as proof of the lessee's duty to explore. The court also found "significant evidence" that Questar was fully aware of the economic viability of the Haynesville Shale, and as a result "there are plans to drill wells in every section or every square mile." However, Questar "presented no evidence of its intention to develop the subject property as to the Haynesville Shale," and the court considered Questar's conduct toward the Ferraras "troubling." The court found that Questar "never had any intention to develop the plaintiffs' deep rights," and thus violated its statutory duty to "develop and operate the property leased as a reasonably prudent operator." La. R.S. 31:122. The court dissolved the lease as to all depths below the Hosston formation. At a later hearing, the court awarded attorney fees and costs as itemized in counsel's affidavit, $71,773.20.
Questar has appealed suspensively, assigning seven errors. LOGA has filed an amicus curiae brief, also seeking reversal. The Ferraras have answered, seeking additional attorney fees for defending the appeal.
By its fifth and sixth assignments of error, Questar urges the court abused its discretion in allowing Peel, who merely collected and summarized publicly available and unverified information from the Internet, to testify as an expert; and in admitting certain summaries and exhibits prepared by Peel that were not included in his expert report and not verified by him. Questar argues that Peel merely downloaded and displayed data from the Commission's SONRIS Website in an effort to "launder" inadmissible hearsay into admissible expert testimony; that six exhibits (P-22 through 27) contained "new" information not included in his original report; and Peel made no effort to verify the SONRIS postings by checking the actual data files.
The Ferraras respond that the court did not abuse its discretion in accepting Peel as an expert, as he possessed "other specialized knowledge" that assisted the court; and the SONRIS data on which he relied fell under hearsay exceptions for public records and reports; tabulations, lists, directories or other published compilations; and general trustworthiness. The Ferraras also show that Questar specifically declined the court's offer of a continuance to review the six contested exhibits, thereby waiving any objection.
If scientific, technical or other specialized knowledge will assist the trier of fact to understand the evidence or determine
At first blush, it might appear superfluous or redundant to admit expert testimony merely to summarize information available to the world on a public Website. However, the SONRIS statistics are fairly dense in their presentation and may not be easily grasped by a person unversed in oil and gas. Peel's report, tables and testimony appear to make some sense out of a mountain of impenetrable data. Given the showing that Peel was indeed competent in his narrow field, and the district court's wide discretion to regulate what kind of evidence might assist it in resolving the ultimate issue, we cannot say the court abused its discretion in accepting Peel as an expert and in admitting his report, tables and testimony. Walker v. Avondale Indus. Inc., supra. Moreover, the expert may utilize inadmissible data if it is of the sort normally used by experts in the field. La. C.E. art. 703; Wyatt v. Hendrix, supra; Turner v. Lyons, supra. There was no showing that experts (or laymen) seeking to plot trends in exploration and development in a particular area or stratum would not use SONRIS data. Finally, Peel was subjected to extensive cross-examination, but Questar did not show a single instance in which SONRIS data was inaccurate. The district court did not abuse its discretion; these assignments lack merit.
By its second assignment of error, Questar urges the court erred in considering and relying on evidence of post-suit activity in the Haynesville Shale formation by Questar and others to determine whether Questar breached its obligation. Specifically, the court refused to apply (a) the suspension doctrine, (b) the lease's own suspension provision, and (c) the general rule that the plaintiff must prove its case. Questar identifies the suspension doctrine as the "well-settled" law that "a mineral lessor's suit challenging the validity of a mineral lease relieves the lessee of its exploration and development obligations during the pendency of the suit." Perkins v. Long-Bell Petr. Co., 227 La. 1044, 81 So.2d 389 (1955). Questar urges the suspension doctrine survived the 1974 enactment of
The Ferraras respond that the district court has wide discretion in ruling on evidentiary questions and was within its discretion to consider conduct occurring after suit was filed. They contend that the suspension doctrine was an equitable rule dating from Leonard v. Busch-Everett Co., 139 La. 1099, 72 So. 749 (1916), but that it was preempted by the 1974 enactment of the Mineral Code. La. R.S. 31:2; La. C.C. art. 561, comment (a). They argue that at least two reported cases have allowed post-default evidence in a claim of failure to explore or develop. Rathborne Land Co. v. Ascent Energy Inc., 2008 WL 5427751 (E.D.La.2008), fn. 7, vacated on other grounds, 610 F.3d 249 (5 Cir.2010); Edmundson Bros. Partnership v. Montex Drilling Co., 1998-1564 (La.App. 3 Cir. 5/5/99), 731 So.2d 1049. Even if the concept somehow survived, they contend there was no equitable basis to apply it, as their suit did not prejudice Questar's ability to explore. Finally, they dispute that the contractual suspension of ¶ 11 applies to this case.
The "suspension doctrine" was predicated both on former La. C.C. art. 792,
Paragraph 11 of the lease provides, in pertinent part:
This passage entitles the lessee to suspend the running of time and payment of royalties until a final adjudication of a dispute, but it applies only when the lessor (or any other person) disputes "the right or interest of Lessee hereunder." The Ferraras did not dispute Questar's right or interest in the lease; rather, they acknowledged the lease and sought to dissolve it for Questar's failure to act as a reasonably prudent operator. The district court did not err in declining to apply the contractual suspension provision.
"Relevant evidence" means evidence having any tendency to make the
We agree with Questar that to prove whether a breach occurred as of the date of suit, evidence of subsequent events would be irrelevant and inadmissible. However, the district court also tried to infer Questar's intent to explore or develop Haynesville Shale on or around the leased premises, and considered that evidence of post-suit activity would prove or negate such intent. Given the court's exceptionally broad discretion in ruling on the admissibility of evidence, we cannot say this was plainly wrong. The fact that the evidence was not admissible to prove the initial breach did not prevent the court from admitting it and assigning it the proper weight. La. C.E. art. 105; Hager v. State, supra. The district court did not abuse its discretion; this assignment lacks merit.
By its first, third and fourth assignments of error, Questar urges the district court erred in finding that it breached its obligation to explore and/or develop the leased premises as a reasonably prudent operator and hence erred in canceling the lease. Cancellation is a harsh remedy that is rarely granted; the breach must be substantial to warrant dissolution. Rivers v. Sun Exploration & Prod. Co., 559 So.2d 963 (La.App. 2 Cir.1990); Taussig v. Goldking Properties Co., 495 So.2d 1008 (La.App. 3 Cir.1986). The Mineral Code, La. R.S. 31:122, requires the lessee to act as a "reasonably prudent operator" based on the totality of the facts, including the factors listed in Vetter v. Morrow, 361 So.2d 898 (La.App. 2 Cir.1978), deferring to the reasonable judgment of the lessee; Questar contends that the factors do not support the finding of a breach. Questar also argues that the mere failure to drill within a specified time does not imply a breach of the lessee's obligation. Carter v. Arkansas La. Gas Co., 213 La. 1028, 36 So.2d 26 (1948). Further, the court improperly shifted the burden of proof with respect to the reasonableness of the lessee's conduct from the plaintiffs to the lessee, an error that resulted in reversal of a judgment that canceled a lease in Frazier v. Justiss Mears Oil Co., 391 So.2d 485 (La.App. 2 Cir.), writ denied, 395 So.2d 340 (1980). Specifically, Questar contends the court erred in interpreting its failure to answer the Ferraras' demand letter as a "persistent refusal" to develop the leased premises. Finally, Questar urges the court erred in fashioning a "Haynesville Shale exception" to the established principles of Louisiana law,
The Ferraras respond that the court committed no manifest error, and in fact properly assessed the relevant factors and found a lack of prudent development, as in Vetter v. Morrow, supra. They cite Questar's news releases and shareholder reports as proof that the company was fully aware of the immense value of the Haynesville Shale, yet failed to do anything on the leased premises. They also submit that Questar failed to answer their demand letter, repeatedly delayed the trial, and then put on no case at all; given this total lack of evidence, the court was entitled to find a breach of R.S. 31:122.
The lessee's obligation is defined in R.S. 31:122 as follows:
The main consideration of a mineral lease is the development of the leased premises for minerals; the lessee must develop with reasonable diligence or give up the contract. Carter v. Arkansas-La. Gas Co., supra; Taussig v. Goldking Properties Co., supra. The lessee also owes the duty of further exploration after initial production in paying quantities has been obtained. Id.; LeJeune v. Superior Oil Co., supra. In determining a lessee's compliance with R.S. 31:122, a court must consider the totality of the circumstances bearing on the lessee's overall operations and measures taken for future development. Useful factors in this inquiry include (1) geological data, (2) number and location of wells drilled, (3) productive capacity of wells, (4) cost of drilling operations compared to profits, (5) time interval between completion of the last well and the demand for additional operations, and (6) acreage involved in the disputed lease. Vetter v. Morrow, supra; Allen v. Horne, 478 So.2d 671 (La.App. 2 Cir.1985).
In light of these factors, the record evidence simply does not support the district court's conclusions. A persistent theme in the cases ordering cancellation of leases for failure to explore or develop is the presence of expert testimony that based on geological data, a prudent operator would drill a well on the subject property. Carter v. Arkansas La. Gas Co., supra; Vetter v. Morrow, supra; Morrison v. D & L Partnership, 499 So.2d 988 (La.App. 3 Cir.1986). The Ferraras' expert, Peel, was not a geologist and did not purport to offer any opinion as to whether placing a new well on their property was prudent. In Saulters v. Sklar, supra, and Frazier v. Justiss Mears Oil Co., supra, the absence of expert testimony to this effect was fatal to the lessors' claims. We certainly understand the district court's sense of awe at the potential of the Haynesville Shale, but there is inadequate support for a blanket finding of "plans to drill wells in every section or every square mile." More importantly, there was no
Through Peel, the Ferraras showed that 12 different operators had permitted, drilled or completed 150 wells to the Haynesville Shale formation in the nine-township area (324 square miles) around the leased premises. They also showed that Questar considered the Haynesville Shale a "world class asset" in which it had increased its acreage to 43,000 acres and drilled six straight wells with 24-hour peak rates of over 20 MMcf/d. However, there was no evidence of the productive capacity of the other wells or the cost of drilling operations compared to profits.
The time frame is also significant. Since the Ferraras leased their property in 1988, a lessee drilled a dry hole on the premises in 1990, and in 1995 the Ferraras obtained a partial release of another lessee's obligation to explore and develop the Baker Lime formation. In short, by the time of trial it had been almost 20 years since any exploration occurred on the leased premises. However, the Ferraras had received steady royalties from three wells, drilled to shallower formations on lands unitized with the leased premises. Chesapeake Energy announced the Haynesville Shale in March 2008, and the Commissioner dispensed with test wells on August 18, 2008. Exactly one week later the Ferraras wrote to Questar demanding a release from the lease below the Hosston formation; only in the alternative did they request exploration or development of these strata. Receiving no response, they filed this suit 46 days later.
Summarizing Louisiana's jurisprudence regarding the obligation to explore Professor Thomas Harrell described the applicable time element as follows:
Thomas A. Harrell, "A Mineral Lessee's Obligation to Explore Unproductive Portions of the Leased Premises in Louisiana," 52 La. L.Rev. 387, 400 (1991) (emphasis added).
We completely understand the Ferraras' (not to mention the district court's) impatience and indignation at Questar's inexplicable failure even to acknowledge the demand letter, its dilatory conduct after suit was filed, and its unhelpful strategy of putting on no evidence. However, the Ferraras received royalties from shallow strata continuously since 1988 and made no demand for further exploration or development since 1994. The instant demand came a mere one week after the Commissioner recognized the potential of the Haynesville Shale by dispensing with test wells; suit was filed only 46 days after the unanswered demand letter. The record is utterly devoid of evidence that any reasonably prudent operator could have begun exploration, much less drilled a well to the deep Haynesville Shale stratum, within this remarkably short time. The
The district court was plainly wrong to find that Questar never intended to develop the Ferraras' deep rights. The record does not support a finding that Questar failed to act as a reasonably prudent operator for the mutual benefit of itself and its lessor as required by R.S. 31:122. While the evidence shows a dismaying degree of indifference on Questar's part, it falls far short of satisfying the usual elements outlined in Vetter v. Morrow, supra, and the jurisprudence. These assignments of error have merit. The judgment partially canceling the mineral lease is reversed.
By its seventh assignment of error, Questar urges the district court erred in assessing attorney fees. It contends that under La. R.S. 31:207, attorney fees are allowed only if the lease is "extinguished or expired," and that partial cancellation does not warrant attorney fees. Leaderbrand & Hardy v. Shallow Oil Co., 234 La. 796, 101 So.2d 673 (1958). The Ferraras respond that another provision of the Mineral Code, R.S. 31:209, authorizes attorney fees for "a demand for dissolution of a mineral lease for failure to comply with its obligations," that Shallow Oil's statement was merely dictum, and that other cases awarded attorney fees for a partial dissolution. Nunley v. Shell Oil Co., 229 La. 349, 86 So.2d 62 (1956); Goodrich v. Exxon Co. USA, 608 So.2d 1019 (La.App. 3 Cir.1992), writ denied, 614 So.2d 1241 (1993). By answer to appeal, they request an additional attorney fee of $15,000 for handling the appeal. Hollenshead Oil & Gas v. Gemini Explorations Inc., 45,389 (La.App. 2 Cir. 7/21/10), 44 So.3d 809, writ denied, 2010-2046 (La.11/12/10), 49 So.3d 892.
Attorney fees are not allowed except where authorized by contract or statute. Sher v. Lafayette Ins. Co., 2007-2441 (La.4/8/08), 988 So.2d 186; Hollenshead Oil & Gas v. Gemini Explorations, supra. The applicable statute is R.S. 31:209:
Although the statute does not expressly refer to a successful demand for dissolution, we are aware of no authority to award attorney fees for an unsuccessful demand. Because we find that the Ferraras failed to prove their right to a dissolution or partial dissolution of the lease, we reverse the award of attorney fees and dismiss the claim for additional fees.
For the reasons expressed, the judgment is reversed and judgment is rendered dismissing the Ferraras' claims at their cost.
APPLICATION FOR REHEARING
Before BROWN, WILLIAMS, CARAWAY, PEATROSS and MOORE, JJ.
Rehearing denied.
CARAWAY, J., would deny rehearing.
I concur in the result of the majority opinion and would deny rehearing. However, the importance of the emerging issue over the lessee's obligations for the exploration and development of a horizontal blanket formation for oil or gas hydrocarbons requires me to express my different view of the governing law and to identify
A misnamed suspension "doctrine" is cast aside by the majority as untethered equity without any analysis of the parties' contractual obligations in this breach of lease action. The lessee is thus admonished for "its dilatory conduct after suit was filed."
The mineral lease is a special contract importing real rights and obligations. La. R.S. 31:114 and 31:16. Like the predial lease addressed in the Civil Code, the mineral lease is a bilateral contract where both parties obligate themselves reciprocally. La. C.C. arts. 2668 and 1908. The contract provides for a "continuous or periodic performance" so that its dissolution would fall under La. C.C. art. 2019, and a partial dissolution for the lessee's failure to develop a formation or formations would be expected. La. C.C. art. 2019; La. R.S. 31:142. With this breach of contract action, the mineral lessor's correlative obligation, as set forth in the Mineral Code and now implicated, is his duty "to refrain from disturbing the lessee's possession." La. R.S. 31:119. The lessor warrants the use and peaceful possession of the lease premises and is bound to deliver those premises for use by the lessee. Id. If the lessor is wrong about the lessee's breach, the lessor's suit is a violation of his duty to refrain from disturbing the lessee's possession. The remedy for such a violation by a lessor, assuming the claim for dissolution was made in good faith, is to delay the lessee's obligation for continued performance until the suit has ended.
This warranty concept was involved in the early ruling in Smith v. Kennon, 188 La. 101, 175 So. 763 (1937) where the mineral lessee sued the lessors after the lessors' execution of a top lease to another party. Finding a viable cause of action, the court ruled:
Id. The lessee's rights which the lessors would not permit were the possessory rights to the premises for the exploration and production of minerals. His lease title was repudiated and development of the lease under that cloud was out of the question. If the granting of a top lease is an informal repudiation, the lessor's filing of a suit for dissolution of the lease is a formal repudiation, placing the continuous performance obligations of the lessee in jeopardy.
This court's ruling in Lelong v. Richardson, 126 So.2d 819 (La.App. 2d Cir.1961) directly addressed the lessee's obligation for continued development of the lease in the face of the lessor's suit for lease cancellation. The court held "that continued development was prevented, first, by the lack of a market for gas, and second, by the institution of plaintiff's suit." Id. at 830. Although a discussion of legal principles was not given in Lelong, the common sense principle is that a mineral lessee can hardly be expected to attempt to enter the lease premises and expend the large investment of an oil and gas well while the lessor is insisting in a pending lawsuit that
The above analysis is not a "doctrine" gleaned from mere equity. It does not concern suspension of prescription, as no servitude theory is involved. It is an analysis of the parties' bilateral relationship in a lease contract requiring a continuous performance by both. It was articulated precisely by the Supreme Court in Perkins v. Long-Bell Petroleum Co., 227 La. 1044, 81 So.2d 389 (1955), as seen by the quote from that case cited by the majority and then ignored. It was applied by this court in Lelong. Finally, with the Mineral Code's express statement of the lessor's obligation to deliver the use and peaceful possession of the lease premises, this basic analysis of the parties' bilateral obligations is not altered in any manner by that Code.
With this mistaken discarding of established law, the majority then proceeded with a confusing discussion over the relevant and irrelevant evidence for the measure of a reasonably prudent operator in this case. Since Questar was prevented from developing plaintiff's property after the filing of this suit in October 2008, it does not matter that a reasonably prudent operator should have drilled a Haynesville Shale well affecting plaintiff's property in 2009 or by the time of trial. When the evidence is detailed further, that is all that the plaintiff's evidence tended to prove.
The majority opinion references 150 Haynesville Shale wells without identifying the time period for the drilling and completions for those wells and the well locations in relation to the plaintiff's property. The plaintiff's brief for rehearing summarizes these 150 wells as located within a "nine-township area surrounding the plaintiff's property," where those wells were permitted, drilled and/or completed by twelve other operators from March 2008 until the time of trial in May 2010. Within this huge 324 square-mile area covering over 200,000 acres in multiple parishes, the first well which plaintiff argues as relevant to his claim was permitted by the Office of Conservation in Section 17, Township 12 North, Range 14 West, some four miles away from the plaintiff's tract in Section 22, Township 12 North, Range 15 West. The permit for that well was issued on October 6, 2008, only four days before the institution of this suit. That well is the only well permitted before the filing of this suit which plaintiff asserts as indicative of Questar's failure to develop his property. Yet, that well was not completed until January 2009. The other 15 nearby wells (out of the 150), which plaintiff argued at trial and on rehearing, were all permitted and drilled after the filing of suit.
From this crucial well data, plaintiff's demand for a breach of the lease occurred in August 2008 when no other operator had successfully completed and produced a Haynesville Shale well in the vicinity of plaintiff's property. Questar was charged by plaintiff for its failure to perform as a reasonably prudent operator when no other operator had yet demonstrated an established productivity of the formation with an economic return in any well nearby. Without any nearby example of a Haynesville Shale test, this is not the case for any "Haynesville exception" to the measure of the development obligation of the reasonably prudent operator which plaintiff urges.
BROWN, C.J., and PEATROSS, J.
We concur in the result of the majority opinion and would deny rehearing for the